We are thrilled to announce our latest project: the revitalization of The Rose & Crown Public House in the charming village of Thorney. As stewards of architectural preservation, we are honored to have been entrusted with this opportunity to breathe new life into a cherished local landmark. Our upcoming endeavor at The Rose & Crown represents a harmonious blend of tradition and innovation as we embark on a journey to enhance its structural integrity and aesthetic appeal.

Project Overview & Commencement:

The scope of our work at The Rose & Crown encompasses a variety of essential tasks aimed at modernizing and rejuvenating the historic establishment. From the installation of cutting-edge VM Zinc materials to the meticulous craftsmanship of milled lead flashings, our team is committed to delivering outstanding results that honor the pub’s rich heritage while embracing contemporary design principles. We are pleased to announce that work on The Rose & Crown Public House is scheduled to commence on the 20th of May. With our dedicated team and unwavering commitment to excellence, we are confident that we will deliver exceptional results that exceed our client’s expectations.

Supply and Install VM Zinc Breather Membrane:

A crucial aspect of our project involves the supply and installation of VM Zinc Breather Membrane. This innovative material serves as a protective barrier, safeguarding the building’s structure against moisture and ensuring optimal ventilation. By incorporating VM Zinc Breather Membrane, we are laying the groundwork for a durable and resilient exterior that will stand the test of time.

Supply and Install VM Zinc Standing Seam:

In addition to the breather membrane, we will be supplying and installing VM Zinc (Quartz) standing seam to the newly formed extension of The Rose & Crown. This sleek and modern material will not only enhance the pub’s visual appeal but also provide superior weather protection and energy efficiency. Our meticulous attention to detail ensures a seamless integration of VM Zinc standing seam with the pub’s existing architecture, creating a cohesive and visually striking façade.

Supply and Install New Code 5 Milled Lead Flashings:

As part of our commitment to quality craftsmanship, we will be supplying and installing new code 5 milled lead flashings. These essential components play a vital role in directing water away from vulnerable areas of the building, ensuring long-term protection against water ingress and structural damage. Our skilled craftsmen will execute this task with precision and expertise, preserving the integrity of The Rose & Crown for generations to come.

Categories: