We are excited to announce that we have been awarded Phase 2 of the restoration works at St Mary’s Church in Swinshead. Following the successful completion of the initial works, this next phase will focus on the essential tasks of leadworks, drainage, and the installation of rainwater goods. These crucial elements will help protect the church from water damage, ensuring its preservation for future generations.

Project Overview:

Phase 2 will include a comprehensive approach to the church’s exterior, addressing both functional and aesthetic needs. Our team will carry out a range of specialized works to ensure that the building remains structurally sound and well-protected from the elements.

Key Elements of Phase 2:

  1. Leadworks: The restoration of lead elements on the church, including roof coverings and flashings, will ensure that water ingress is prevented and the church’s original features are preserved.
  2. Drainage: We will carry out drainage improvements to help manage the flow of water around the church, reducing the risk of damage to the structure over time.
  3. Rainwater Goods: The installation of new rainwater goods, such as gutters and downpipes, will enhance the church’s ability to channel water away from vulnerable areas, contributing to the long-term stability of the building.

Categories: